This base finished with 6 modules and 6 corridor cells, including 1 greenhouse module, 1 water module and 0 utility modules. Connecting 100% of modules to the habitat is a clear layout strength: most installed equipment had a route into the base network. Protective modules accounted for 0% of module cost, leaving limited evidence of deliberate protection against a route or utility failure. The average geometric distance from a greenhouse to its nearest water module was 8 grid steps. A greenhouse-to-utility distance was unavailable because one module type was absent. Shorter distances can simplify a design, but distance alone does not show whether a corridor is connected, has enough flow capacity or survives a hazard.
The layout's weak point should be judged against what happened during operation: average water reserve was 23.85, and 1 crisis events were recorded. The narrow water margin makes the greenhouse supply route a priority for inspection. Compare the map with the operation and incident timelines to see whether a single corridor or utility was repeatedly stressed. In the next mission, retain the same crops and care settings while changing one connection or adding a backup route; compare delivered resources, harvests and crisis turns. This is a diagnosis of the simulated network and its observed outcomes, not proof that the same geometry would work on the Moon.
Distances are geometric. Follow the replay to inspect actual connections and turn results.
BASE LAYOUT / COMPLETELevel 1 · turn 10
22 / 22
Selected moment
Level 1 · turn 10
Harvested crop slot 1
Incident: temperature · severity 0.9
Critical resource condition
Power
0
Water
11.1
Oxygen
65
Food
39
Crop yield
27
Meat yield
20
Accepted player commands
Operation log
Select an entry to show the base immediately after that step. Minigame input proofs are omitted from the readable log.